A Test Day Diary: Finding a Montgomery Skimmer Leak Step by Step
What actually happens when a technician shows up for a leak detection? This diary follows one visit from start to finish. The result was a Montgomery skimmer leak with two marked points, found only after everything else had been cleared.
Arrival: reading the pool
The visit starts with a walk around. The technician looks at the water level, the deck, the skimmers and the equipment pad. Nothing on this concrete pool looked obviously broken, which is common. Most leaks do not show from the deck.
First: the plumbing, line by line
- Pool returns
Sealed and brought to 12 psi. Held. - Cleaner line
Held. - Skimmer line and front port
Both held. - Main drain and common line
Both held. - Spa return and suction
Both held. - Water feature return and suction
Both held.
Ten lines, ten passes. At this point the plumbing was cleared.
Next: drains and features
Next came hydrostatic tests on the main drain, the spa suction and the water feature suction, plus the sheer descent. All passed. The equipment passed too.
A small fix along the way
While checking the lights, the technician sealed the light with butyl tape. It is a small step, but it closes a possible path for water before it becomes one.
Then: dye at the Montgomery skimmer leak
With pipes and drains cleared, the shell was next. Dye across the surface stayed still. At the skimmer throat, it did not. The dye pulled inward at two separate points, and the technician marked both.

Wrap-up: the report
Before leaving, the technician goes over the findings. On this pool the list was short. Two skimmer injections, one for each marked point at the throat. Everything else passed.
| Order | Step | Outcome |
|---|---|---|
| 1 | Walk-around | No visible damage |
| 2 | 10 pressure tests | All held |
| 3 | Hydrostatic tests and equipment | All passed |
| Along the way | Lights | Sealed with butyl tape |
| 4 | Dye at skimmer throat | Two leak points |

What the Montgomery skimmer leak diary does not show
A diary makes a visit look tidy. In reality, each step depends on the one before it. For example, if a pipe had failed in the first round, the technician would have spent more time tracing it before moving on. The order stays the same, but the time spent at each step changes.
Also, a diary cannot show judgment. When the dye moved at the skimmer throat, the technician checked whether it was one opening or two. On this pool, there were two, so there are two marks and two injections. That small difference changes the repair.
Why two points at one skimmer
The throat is where the skimmer meets the concrete. As the deck and shell move over the years, that joint can open in more than one place. Therefore, a careful dye check works around the whole throat, not just one side.
Finally, the lights. Sealing them with butyl tape was a small step, but it shows the habit behind the whole visit. If something can be closed up while we are there, we close it.
One last point about the order of the visit. Because the dye step came last, its result is easy to trust. Every pipe had already passed, so the only place left for the water to go was the shell. That is what turned two small dye movements into a confident answer, and it is why the repair list is so short.
Curious about the repair? Our skimmer leak repair page explains skimmer injections, and our pool pressure testing page covers the pipe tests. See the area we serve on the Montgomery pool leak detection page or read reviews on our Google page. Book your own test day.

